A review run always moves the label. The rule is written down because its absence
cost a real stall: a green code review whose merge conflicted left the label alone,
the waiting author polled thirty times and reported the limit as exhausted, and a
verdict that existed reached nobody.
Both documents now say what S6-in-progress means when the verdict was green and
only the merge failed — rebase, not rework, and the verdict still stands. They also
say that a label which did not change means the run failed rather than the work, so
the answer is logs and the owner, not more polling. Cycles are counted per stage.
Issue: #114
User-Visible: no
Section 10.1 promised pre-push as the blocking gate that replaces pull requests.
The hook did not exist, so the document promised a check that was not there —
worse than saying nothing, because a promise like that gets relied on. Until now
process-gate ran only as the catch-up job in CI, which reports after the code is
already in dev.
The hook skips branch deletions and tags, and for a branch the remote has not
seen it measures from the merge-base with dev rather than from the root, or every
violation committed before the gate existed would make it impossible to pass. A
missing script does not block a push: old checkouts and worktrees have to stay
usable.
gh is optional on purpose. Reading issue status needs the network, and a hook
that cannot work on a train is a hook people switch off; offline it runs what it
can and CI does the strict pass.
The executable bit is the quiet part. Git skips a hook without +x and says
nothing — the gate reports success by being absent. Measured on a real push:
mode 644 produces zero lines from the gate and the push goes through, 755 stops
it. The API cannot set the bit, so install-hooks restores it on every install.
Issue: #121
User-Visible: no
The canon moved into the repository in #112 and then stood still while the
process kept moving. A document that lags is worse than no document: an agent
reading it as truth acts on rules that no longer exist. It promised a pre-push
hook that was never written, named labels in Russian that the repository has
never used, listed a status set the gate no longer applies, and said nothing at
all about the event-driven pipeline — the largest mechanism the process has.
Label names are now English throughout and S8-merged is documented. Section 1
covers the configuration files the gate kept reporting as unclassified, and
records that D beats A where paths overlap, since the built bundle lives inside
custom_components/houseplan/frontend/. Section 10.1 admits that pre-push does
not exist. Section 10.2 matches ALLOWED_STATUS in scripts/process-gate.mjs,
including the two caveats that only surfaced once the pipeline ran. Section 10.4
is new and documents the four silent-failure traps that cost a working day each.
The source-of-truth order now says that actual automation outranks its own
description — this document included.
Issue: #119
User-Visible: no
Publishes the 538-line process canon into the repository, replacing the
51-line provenance stub that pointed at a non-existent .agents/PROTOCOL.md.
Rewrites AGENTS.md: product context first, labels as the canonical status,
rule #1 with the status check, change classes, trailers, push cadence,
Codex/Claude roles and review cycle limits.
Issue: #112
User-Visible: no