Matysh 948f2848dd docs: a failed pre-release gate does not send the issue back to review
The implementation loop runs typecheck, unit and build. Golden, browser smokes,
performance and the full HA harness run before a beta — after the code review has
passed and the issue already sits in S8-merged. Some defects cannot surface any
earlier, and until now the process had nothing to say about them, so the honest
reading was a second full review cycle at the most expensive possible moment.

The owner's decision: fix it, re-run what failed, and a green run carries the
release on. The gate named the defect precisely and the same gate proves the fix,
so the check is objective and depends on nobody's judgement.

The boundary is written down with it, because "the gate found something" could
otherwise absorb an arbitrary amount of new work. A fix that changes a behaviour
contract, reaches an untouched subsystem or rivals the task in size goes through
the normal flow. Editing a test so it stops failing is concealment rather than
repair — the exception is a defect proven to be in the fixture, as on #89.

The rule also records what it costs: the author judges his own work here, which
the process refuses everywhere else. That is the price of speed at the one point
where a review cycle is dearest, and the compensation is that the re-run command
and its result are written into the issue where the release manager reads them.

Issue: #114
User-Visible: no
2026-08-13 19:36:39 +03:00
Matysh dbe12f1a54 docs: state the invariant the pipeline was missing
A review run always moves the label. The rule is written down because its absence
cost a real stall: a green code review whose merge conflicted left the label alone,
the waiting author polled thirty times and reported the limit as exhausted, and a
verdict that existed reached nobody.

Both documents now say what S6-in-progress means when the verdict was green and
only the merge failed — rebase, not rework, and the verdict still stands. They also
say that a label which did not change means the run failed rather than the work, so
the answer is logs and the owner, not more polling. Cycles are counted per stage.

Issue: #114
User-Visible: no
2026-08-13 17:13:54 +03:00
Matysh 42335bc16d ci: add the pre-push gate and stop lying about it in the canon
Section 10.1 promised pre-push as the blocking gate that replaces pull requests.
The hook did not exist, so the document promised a check that was not there —
worse than saying nothing, because a promise like that gets relied on. Until now
process-gate ran only as the catch-up job in CI, which reports after the code is
already in dev.

The hook skips branch deletions and tags, and for a branch the remote has not
seen it measures from the merge-base with dev rather than from the root, or every
violation committed before the gate existed would make it impossible to pass. A
missing script does not block a push: old checkouts and worktrees have to stay
usable.

gh is optional on purpose. Reading issue status needs the network, and a hook
that cannot work on a train is a hook people switch off; offline it runs what it
can and CI does the strict pass.

The executable bit is the quiet part. Git skips a hook without +x and says
nothing — the gate reports success by being absent. Measured on a real push:
mode 644 produces zero lines from the gate and the push goes through, 755 stops
it. The API cannot set the bit, so install-hooks restores it on every install.

Issue: #121
User-Visible: no
2026-08-13 14:58:57 +03:00
Matysh 5aa8771dc3 docs: bring the process canon back in line with what actually runs
The canon moved into the repository in #112 and then stood still while the
process kept moving. A document that lags is worse than no document: an agent
reading it as truth acts on rules that no longer exist. It promised a pre-push
hook that was never written, named labels in Russian that the repository has
never used, listed a status set the gate no longer applies, and said nothing at
all about the event-driven pipeline — the largest mechanism the process has.

Label names are now English throughout and S8-merged is documented. Section 1
covers the configuration files the gate kept reporting as unclassified, and
records that D beats A where paths overlap, since the built bundle lives inside
custom_components/houseplan/frontend/. Section 10.1 admits that pre-push does
not exist. Section 10.2 matches ALLOWED_STATUS in scripts/process-gate.mjs,
including the two caveats that only surfaced once the pipeline ran. Section 10.4
is new and documents the four silent-failure traps that cost a working day each.

The source-of-truth order now says that actual automation outranks its own
description — this document included.

Issue: #119
User-Visible: no
2026-08-13 14:24:50 +03:00
Matysh 53da8a1773 docs: align AGENTS.md and PROCESS.md with the actual process
Publishes the 538-line process canon into the repository, replacing the
51-line provenance stub that pointed at a non-existent .agents/PROTOCOL.md.
Rewrites AGENTS.md: product context first, labels as the canonical status,
rule #1 with the status check, change classes, trailers, push cadence,
Codex/Claude roles and review cycle limits.

Issue: #112
User-Visible: no
2026-08-13 10:30:00 +03:00
Matysh ce40c57a3b build: prepare v1.62.0-rc.1
User-Visible: yes
Issue: #108
2026-08-13 00:35:24 +03:00
Matysh 37032203dd fix: harden v1.62.0-beta.10 candidate
User-Visible: yes
Issue: #108
2026-08-13 00:14:51 +03:00
Matysh 8e2973fa7a Release v1.62.0-beta.9 candidate
Issue: #108
User-Visible: yes
2026-08-12 21:49:29 +03:00
Matysh 9e74051652 Release v1.62.0-beta.8 candidate
Issue: #75
Issue: #76
Issue: #95
User-Visible: yes
2026-08-12 19:18:54 +03:00