The candidate is the branch tip, which already carries the round's
CODE-REVIEW-N-rK.md; the material the reviewer read does not. With
docs/reviews in the diff the two patch-ids never matched once dev had
moved, so every green candidate went back to review whenever another
task published its own document in the meantime — #514 looped twice on
09.09 and #508 only merged when dev happened to stand still. The
patch-id now excludes docs/reviews, exactly like `reviewedFresh` next to
it; a real change of the patch under rebase still returns the task.
Mutant: merge-rereviews-own-review-doc.
Issue: #516
User-Visible: no
Code review r3 (M1): realOps.releases() swallowed a failing `gh release
list` into an empty list, so a fine-grained token scoped to houseplan-e2e
alone would have dispatched with upgrade_from=stable — the tag onto
itself — and the red run would look like the bug 4143f998 already fixed.
The call now throws like dispatch() and lands in the same catch: result
`error` with the token hint, which now names both repositories. L4:
PROCESS.md says who dispatches and who waits.
Issue: #514
User-Visible: no
Two findings from the live run on v1.73.0 (houseplan-e2e run
34393136097): the upgrade job carries the previous stable's tag in its
name, so "any job with HP <tag>" let a gate for v1.72.0 adopt the
v1.73.0 run — recognition now keys on `journeys`/`first-run`; and the
first poll after a dispatch sees only the matrix-planning job, which
marked the run as foreign forever — a run without any `· HP … ·` job is
undecided and polled again. Live: v1.73.0 → green with the run link,
v1.72.0 → no run of its own.
Issue: #514
User-Visible: no
Live run on v1.73.0 (houseplan-e2e run 34392391382): at `release:
published` the new tag is already the newest stable, so
`upgrade_from=stable` made the upgrade suite update v1.73.0 onto itself
and fail with `Expected: not "1.73.0"`. The gate now resolves the newest
non-prerelease, non-draft release other than the tag from `gh release
list` and passes it as `upgrade_from`; the first stable ever falls back
to `stable`. Spec §4/§6 record the change and the matrix-planning job in
houseplan-e2e (a job-level `if` cannot read `matrix.*`).
Mutant: release-upgrades-stable-onto-itself.
Issue: #514
User-Visible: no
The stable gate proved Validate and Full Performance on the exact SHA but
never ran the release in Home Assistant itself. houseplan-e2e installs
the release's houseplan.zip — the bytes HACS ships — into HA in docker
and walks the sidebar page, dashboards, roles, PDF, restart and the
stable→tag upgrade. release.yml now dispatches e2e.yml on the tag for
`!prerelease` releases and waits for it (scripts/e2e-gate.mjs, modelled
on validate-gate.mjs): the gate recognises its own run by `HP <tag>` in
the job names, ignores foreign dispatches, and reports red / missing /
cancelled / token error with the run link. Betas are untouched.
Mutants: release-ships-on-red-e2e, release-trusts-foreign-e2e-run.
Issue: #514
User-Visible: no
The material anchors (commit, tree, spec blobs) written into every
review document came from the checkout step, before "Привести ветку к
dev". Whenever dev had moved — since 09.09 every review-document publish
moves it — the pipeline rebased and force-pushed the branch, orphaning
the pre-rebase commit and its tree. A fresh clone in the next run could
not resolve that tree: reuse (#499) always reported false and the
model reviewed the same code again, and the #413 post-step refused the
green round because neither the cited SHA nor the tree anchor was
reachable — #508 took three identical green rounds this way.
The `material` step, which already fixes the reviewed SHA after the
rebase, now also records the tree and spec blobs, and the publish step
reads all three from it. The contract test pins the order and forbids
reading anchors from the checkout step.
Issue: #515
User-Visible: no
In HA hp-dialog renders ha-dialog, whose own `.body` is the scroller and
is not a flex container; `.summary-editor` (overflow:auto,
overscroll-behavior:contain, min-height:0) therefore grew to its content
and became a scroll container that never scrolls — Chromium stops wheel
and touch scroll chaining at such a child, so nothing moved (reproduced
on ha.jbstudio.pro, HA 2026.9.1, and in an isolated Playwright page).
hp-dialog gains an opt-in `flex-content` attribute forwarded as
ha-dialog's `flexcontent`, which lays the body out as a flex column: the
editor is height-bound again and scrolls itself, header and footer stay,
exactly as the native branch already did. Only the summary dialog opts in.
Smoke demo/smoke_summary_dialog_scroll.mjs stubs ha-dialog after the HA
2026.9 contract: wheel on desktop, touch swipe on a phone, dialog within
the viewport, and a witness that the stub reproduces the bug without
flexcontent. Docs screenshots: 11/11 pixel-identical (docs:accept
--identical, #512), fingerprint refreshed.
Mutants: summary-dialog-drops-flex-content, hp-dialog-ignores-flex-content.
Issue: #508
User-Visible: yes
Code review r1 (M1): scripts/pre-push-gate.mjs — in its comment and in
the text every developer sees before a push — still named the full
mutation registry a pre-release gate; the same phrase lived in the
header of test/mutation-gate.test.mjs. Both now point at the nightly
schedule (#513); golden/smokes/HA harness are named as the heavy
Validate set on the candidate.
Issue: #513
User-Visible: no
The full registry run proves that tests can fail, not that the product
works; 4 of its 5 runs since 02.09 were manual dispatches tied to
releases. Owner decision 09.09: a daily schedule (01:00 UTC, before the
02:30 nightly Validate), failures reported as an issue by the existing
#472 job, no place in the development or release flow. Docs and the
workflow comments say so; the test pins the daily cron.
Issue: #513
User-Visible: no
Re-acceptance after the version seam (#512 §7) from the full Validate
dispatch on 605991ef (run 34366858855): seven frames carried the version
text — three version-mismatch banners, three PDF footers, the support
preview — and now read `0.0.0-golden`; six of them were within threshold
and still showed stale betas (beta.4, beta.8). The other 162 frames are
kept as reviewed; 128 environment witnesses matched byte for byte.
Sub-threshold drift in nine unrelated frames (tray, resize handles,
compass, junction) is not accepted.
Issue: #512
User-Visible: no
Release: v1.74.0-beta.1
Baseline-Reviewed: https://github.com/Matysh/houseplan-card/actions/runs/34366858855
Golden frames carried the card version text (about, version banner,
support/export previews), so every beta bump re-accepted up to 20
baselines that had not visually changed. The version now reaches the DOM
and stand requests through displayVersion() (src/card-version.ts); the
golden harness pins window.__HP_VERSION_OVERRIDE__ = '0.0.0-golden'
before the card is created. CARD_VERSION literals stay where the release
contract reads them; cache-busting and the console banner keep the literal.
Docs screenshots: `npm run docs:accept -- --identical` re-captures
locally, compares decoded RGBA pixels with the committed frames inside
Chromium (scripts/png-identical.mjs) and, only when every frame is
identical, refreshes the manifest fingerprints and captureScriptSha256;
bytes stay, any difference refuses with a per-frame count. First run on
this tree: 11/11 identical, manifest refreshed.
Mutants: version-seam-ignores-override, docs-identical-accepts-any-frame.
Issue: #512
User-Visible: no
Spec review r1 (H1): the `--out` flag would have changed the only file
guarded by `captureScriptSha256` and reddened check-docs on its own. The
identical-accept mode now leaves demo/docs/capture.mjs as is (frames are
backed up and restored around the standard capture) and takes
`captureScriptSha256` from the candidate manifest together with the
source fingerprint; the docs re-acceptance for this issue is the first
local --identical run in the same branch.
Issue: #512
User-Visible: no
Code review r2 (M1): the cancelled-run filter in merge-candidate's
waitValidate had no test or mutant — every test replaced ops.waitValidate
with a fake. realOps now takes an injectable `exec` (default: the same
spawnSync wrapper) so the real implementation runs against scripted
`gh run list` answers: a cancelled dispatch is skipped and its
replacement followed; a lone cancelled run ends in `missing`, never red.
Mutant: merge-trusts-cancelled-dispatch.
Issue: #510
User-Visible: no
Code review r1 (M1): validate-gate.mjs and merge-candidate's waitValidate
read a `cancelled` dispatch run on the material as red, so a dispatch
replaced by the next one in the `validate-dispatch-<ref>` concurrency
group would have returned the task S7→S6 for nothing — the same class
#511 fixed in release-gate.mjs. Cancelled runs are now ignored: the gate
follows the replacement dispatch, or starts its own when there is none.
Mutant: review-returns-task-on-cancelled-dispatch.
Issue: #510
User-Visible: no
The mutant registry pointed at the pre-r1 verdict helper that no longer
exists; the anchor test caught it in CI. The patch now removes the red
branch of the completed-run check.
Issue: #510
User-Visible: no
Validate ran the three "Мутанты по диффу" shards on every push of every
branch: 48 of 56 job-hours on 08–09.09, most of them cancelled by the
next push. Mutants now run when asked — pull requests, the nightly
schedule, a push carrying a `Release:` trailer, or a dispatch with
`mutants=true` (classify-changes.mjs → `mutants_requested`); an ordinary
push runs the light checks only.
The proof moves to where it is consumed. process.yml gets a gate after
the #499 reuse step: on the code stage it looks for a dispatch Validate
run on the exact material SHA whose mutant jobs executed and passed
(scripts/validate-gate.mjs); none → it dispatches one and waits; red or
missing → the task goes back S7→S6 with the run link and the review
cycle is not spent. Spec stage and the reuse fast-path skip the gate
(`proceed=true`); all later steps branch on `proceed` in place of the
old conflict conjunct only. merge-candidate.mjs dispatches Validate on
the pushed candidate and waits for that dispatch run.
PROCESS.md/AGENTS.md: review does not start on red code; one handoff —
one push.
Mutants: mutants-run-on-every-push, review-starts-on-red-validate,
review-trusts-push-run-without-mutants, merge-waits-push-run-without-mutants.
Issue: #510
User-Visible: no
Spec review r3: `proceed` is true on the reuse fast-path too, so it must
replace the `rebase.conflict != 'true'` conjunct alone; the existing
`reuse != 'true'` (#499), stage and decide conjuncts stay on every step
that has them. The "single variable" claim is narrowed accordingly.
Issue: #510
User-Visible: no
Spec review r2: §5.2 named the gate outcome three different ways; the
skip branch (spec stage, reuse fast-path) would have matched a literal
`result != 'green'` and produced a spurious S7→S6 return. All step
conditions now branch on `proceed` only (true = green or skipped, false =
red/missing); `result` feeds the comment text alone.
Issue: #510
User-Visible: no
Spec review r1: place the gate after the #499 reuse step so its output is
defined; a green dispatch counts only when the "Мутанты по диффу" jobs ran
and passed (a foreign dispatch with mutants=false leaves them skipped);
therefore the Validate job runs whenever mutants are requested, even on an
empty selection. Explicit User-Visible/UX/i18n N/A statement added.
Issue: #510
User-Visible: no